Jack-In RC Pile Projects

Jack-in Pile employs static kentledge weight of the piling frame as a reaction to install piles. Hydraulic jacks 'pull' the pile into the ground in excess of factor-of-safety ranging from 1.5 to 2.0 times. Wide range of equipment ranging from 30 to 160 tons are available to suit various site requirements. The system gained popularity and is widely applied due to it substantial savings compared to other piling systems.

Screenshot 2023-10-24 at 3.40.21 PM.png

New HDB Linkway Foundation

IMG_20220321_160307.jpg

Side Jacking Mast

Install Load (iL) < 800kN

Setback distance 1500mm

Commercial project adjacent to MRT

20160304_183820.jpg

Side Jacking Mast

Install Load (iL) < 800kN

Setback distance 1500mm

Food Factory Reconstruction

20190527_144009.jpg

Side Jacking Mast

Install Load (iL) < 800kN

Setback distance 1500mm

Vibration Sensitive Industrial Project

20180425_211857.jpg

Centre Jacking Mast

Install Load (iL) > 800kN

Setback distance 2800mm

Semi-Con Factory Extension

20191115_165723_edited.png

Centre Jacking Mast

Install Load (iL) > 800kN

Setback distance 2800mm

Drain widening on metal platform

Screenshot 2023-11-03 at 6.55.26 PM.png

Side Jacking Mast

Install Load (iL) < 800kN

Machine weight 120 ton

Factory mezzanine floor A&A

Side Jacking Mast

Install Load (iL)  <     800kN

Front setback distance:  1600mm

Side setback distance:  3000mm

Minimum headroom:  7000mm

RC pile Length sections:        4.0m

Screenshot 2023-11-03 at 7.05.33 PM.png

Slab strengthening underpinning works

Side Jacking Mast

Install Load (iL)  <   300kN

Front setback distance:  1400mm

Side setback distance:  1800mm

Minimum headroom:  5000mm

RC pile Length sections:        3.0m

Screenshot 2023-11-06 at 4.57.29 PM.png

New Erection to landed intermediate terrace

Site width 6.0m

Side Jacking Mast

Install Load (iL) < 500kN

Front setback distance: 1500mm

Side setback distance: 2000mm

20180528_120523.jpg
20191226_144414.jpg

School Sport Hall A&A

Close proximity piling operation

Install Load (iL) < 800kN

Front setback distance:  1600mm

Side setback distance:    2800mm

Landed Residential

Bitumen wrapped RC piles

20180528_151308.jpg