Your Preferred Foundation Provider
Near Paya Lebar MRT Station
HDB Linkway foundation
Silent
Near Paya Lebar MRT Station
Your Preferred Foundation Provider
ABOUT US
Peck Brothers was setup in 1980 and incorporated in 1984 as a privated limited company. In the early years, it was mainly involved in the laying of water and gas utility mains for the then Public Utilities Board.
In 1991, the company ventured into foundation works on large crawler hydraulic hammer piling rigs, followed by jack-in precast RC pile and later diversified to driven steel micropile. In 2004, the trend of using jack-in-piles became increasingly popular and the company ventured into the design and fabrication of piling rigs. In keeping up with market trends and demands, the company introduced Bored Micropile system and other services including Pre-bore H-pile, Prebore Relief Well, Silent Steelpipe & H-pile and Mini-bore to expand our scope of capabilities.
We are BCA registered contractor with piling workhead CR08 - grade L5, and obtained ISO 9001, ISO 14001 & ISO 45001, achieved piling specialist builder license & Biz Safe Star certifications.
PECK BROTHERS aspire to deliver Quality, Reliable & Safe piling solutions to our customers through Teamwork & Value-added services. Building our skills & Trust with our customers, we endeavour to continuously Innovate & Upgrade our skills & equipment to serve & propel our customers to greater Success.
PECK BROTHERS aims to grow sustainably in the arena of mini-piles. We strive to improve the quality of life & society by serving our clients with a range of lower-noise, less-disruptive piling related solutions. We endeavour to install each & every pile with integrity, serve one more happy customer, every time.
3
Piling Systems
L5
BCA Workhead CR08 Grade
Biz Safe
Work-in-progress
TECHNICAL
Driven Steel Micropile
Jack-In Pile
Bored Micropile
Prebore Hole
APPROVED TRAINING & TESTING CENTRE
(ATTC)
Since July 2011,Peck Brothers has been comissioned by the BCA as one of its Approved Training and Testing Centre (ATTC). Read on to find out more on the costs and training structure below.
At Peck Brothers, we provide training and testing to candidates, with or without prior experience, in Jack-In Piling or Driven Piling Operations who wish to:
-
Obtain Skills Evaluation Certificates (Knowledge) SEC(K)
-
Register as CoreTrade Tradesman
-
Register as Multi-Skilled Personnel
CoreTrade is a worker's registration scheme, administrated by BCA, for building up a team of competent and experienced construction personnel in their respective trade that require them to undergo a Skills Assessment (SA) with Familiarization Course (FC). CoreTrade personnel are qualified as "Higher Skilled" R1 workers under MOM's Foreign Worker Levy Scheme.
Multi-skilling scheme, also known as Express Course for obtaining 2nd SEC(K), was introduced to offer an alternative pathway for respective industry to upgrade their experienced workers to "Higher Skilled" R1 construction work permit holder (WPH).
What we do
ATTC Training Benefits:
-
Enjoy Lower Levy - can save up to $4800 per pax per year.
-
Achieve 10% minimum R1 Work Permit proportion requirement.
-
Improve workforce productivity as worker gets more skilled and knowledgeable, which will help firms bettetter mnage their manpower cost and stay competitive.
-
Work Permit Holders able to work in Singapore up to 26 years.
-
Claiming for training & test fee under Workforce Training & Upgrading (WTU) scheme
(Up to 90% for Local/SPR)
Benefits
Operation
Jack-In Piling
Driven Piling
Operation
CONTACT US
Training Centre
Peck Brothers Construction Pte Ltd
203 Kranji Road Singapore 739481
Contact Form
Contact Us
For any inquiries, questions or recommendations, please contact us at:
T 6368 6288
F 6365 1928
Email: project@peckbros.com
9756 6288
For ATTC inquiries, questions or feedback, please contact us at:
T 6362 2098
F 6362 6608
Email: training@peckbros.com